Meeting established deadlines and not exceeding the budget is crucial for the construction of an industrial ship. In this article, we present the most common reasons why they are delayed and how you could solve them.
1. Errors or omissions in the project: When the technical file of the project is prepared by the owner and errors or omissions occur, instructions on how to resolve it should be expected. The reality of the terrain differs from the plans. This causes delays while the inconsistency is resolved.
2. Changes in the contracted scope: When changes are made to the project due to the owner’s needs, it often results in delays in delivery. Those who prepared the technical file must say how the change should be made, and often this response is not immediate.

3. Lack of virtual construction design (VCD): When the building is a factory and is being built to receive equipment without a virtual construction design (VCD), it is common to have to modify the support points, electrical supply, sewage evacuation, or other elements that are not in the correct place, causing delays and additional costs.
4. Unforeseeable events: The contractor may not take into account that there are always unpredictable events during construction, such as strikes, material shortages, and other fortuitous events that can temporarily stop work. Inadequate procurement management: When the contractor does not make adequate procurement arrangements, work may stop due to the lack of these materials.
5. Social conflicts: When the contractor has not taken into account the potential social conflict in the area where the industrial warehouse will be built and has not taken adequate preventive measures, causing work to stop.
Many of these problems can be avoided with quality management:
- Monitor and ensure the quality of materials and construction processes.
- Avoid delays and additional costs.
- Ensure compliance with regulations and regulations.
- Verify that it is durable and functional to reduce maintenance and repair costs.
With Q-Ver, you can be sure that the construction of your industrial ship will be of high quality and within your budget.